To discuss your project give us a call on 01392 861763

You only need to use EPS on the lower 300mm of the wall externally or if the external ground level is higher than the internal. If the ground level externally is higher than internal you should use EPS up to at least 150mm higher than the external level. This can be our EPS200 plinth boards, bonded with the UdiBASE plinth slurry. The UdiIN will then be installed above it.

CPD Training

We offer CPD training for architects practices across Devon and Cornwall.

Software Modelling

We offer dynamic heat and moisture modelling as well as condensation risk analyses.

Building Plan Review

If you have some plans and would like our opinion on which materials would be the best for you, contact us.

Overview

Back to Earth is a natural building material supplier. We're not your typical builders'​ merchant though and instead work closely with our clients during the planning, designing and building phases of projects.

Back to Earth is a proud signatory of the Anti-Greenwash Charter:

© 2023 Back to Earth