To discuss your project give us a call on 01392 861763

What do I do at the plinth with the UdiFRONT system?

Find out more about how we approach this building scenario.

There are two options. You can take the EPS plinth insulation right down to the ground and then take the UdiPERL render down to the ground too. Or, you can use the UdiBASE plinth rail, fixed just above dpc level usually or at around 150mm above ground if no DPC is visible. It is important to remember that none of the Diffutherm wood fibre should be less than 300mm above ground level in either case.

The UdiBASE plinth slurry should be used behind the EPS plinth insulation to ensure full contact with the masonry behind, you may need to render this flat first if it’s uneven. Once you have put the UdiFOUNDATION COAT render on, remember to apply a slurry of the UdiBASE plinth slurry over this and leave to dry for 24 hours before you apply your primer. 

CPD Training

We offer CPD training for architects practices across Devon and Cornwall.

Software Modelling

We offer dynamic heat and moisture modelling as well as condensation risk analyses.

Building Plan Review

If you have some plans and would like our opinion on which materials would be the best for you, contact us.

Overview

Back to Earth is a natural building material supplier. We're not your typical builders'​ merchant though and instead work closely with our clients during the planning, designing and building phases of projects.

Back to Earth is a proud signatory of the Anti-Greenwash Charter:

© 2023 Back to Earth